The hydrogen refueling station in Rothenburg is swiss wide the second hydrogen refueling station from AGROLA. This was also realised in conjunction with the H2Haul project, which is an EU-funded project that aims to deploy 16 zero-emission fuel cell trucks at four sites until 2026.
Main Specifications
Manufacturer: Maximator
Refueling type: 350 & 700 bar (PKW & LKW) parallel
H2-Storage: 350 bar containers (Hydrospider)
Back-to-back capacity: 12 cars / 6 trucks
Space: ~140m² (incl. container storage, without dispenser)
Services provided by H2 Energy AG
- First greenfield project of an H2 refueling station incl. construction as client & owner
- Customised financing model for H2 Haul project
- Evaluation of possible suppliers of H2 fueling station equipment
- Evaluation of technical and economic aspects across the entire production and supply chain
- Support during the preparation of the planning application, detailed planning, commissioning.
General Services H2 Energy – a reliable, experienced partner
- Feasibility study for an H2 refueling station: Site analysis, preliminary clarifications with authorities, installation concept, rough profitability analysis & schedule
- Preparation of planning application: Elaboration or control of installation plan (area, access, ex-zones)
- Implementation planning: Collaboration/support in obtaining quotations, ordering H2 fueling station components, planning on-site work
- Installation & commissioning: Supporting the site management / client with the delivery and installation of the H2 components, commissioning, certification and acceptance
Other Projects
HRS projects in which H2 Energy was involved in a similar way:
- AVIA: Gossau (St. Gallen)
- Schwab-Guillod: Müntschemier
- Coop: Bern
- Coop: Crissier
- Coop: Frenkendorf
- AVIA: Puidoux
- SOCAR: Grauholz
- AVIA: Pratteln
- Oeltrans (in planning): Uetendorf